The Deck Begins

The deck is started. These guys are crazy...this is 25 feet above the ground.

Tuesday, December 2, 2008

Dormer Is Framed

The master dormer is framed. It includes the master bathroom and master sitting room.

Thursday, November 20, 2008

Danger Closet

Can't believe this never fell off the house. The floor always slanted away from the house but we never knew just how dangerous it was...can you believe there was only 3 small boards holding this up? It was concealed by siding. When they were taking it down, it basicall fell off the house onto the deck (slightly damaging the railing)...at least no one was in there at the time. This is now replaced by a new "bump out" in the dining room.


Wednesday, November 19, 2008

The Tubs Are Delivered

The tubs are delivered. It kind of reminds me of The Christmas Story...it looks like the box that the leg lamp was delivered in...

Tuesday, November 18, 2008

The Dormer Is Opened

The roof was opened to build the back dormer. The roof needed to be jacked up and many of the supports were replaced. This also so happened to be the coldest week of the year.