A journey through our 1906 Inman Park bungalow renovation
Thursday, January 29, 2009
More Tile & Grout
Let the Painting Begin
The Stairs Get Some Hardwood
Front Gutter Is Installed
Front Porch Is Looking Good
Monster Deck Piers are Installed
Driveway is Re-Poured
Older Posts
Home
Subscribe to:
Posts (Atom)
Subscribe To
Posts
Atom
Posts
All Comments
Atom
All Comments
Followers
Blog Archive
▼
2009
(11)
▼
January
(11)
More Tile & Grout
Let the Painting Begin
The Stairs Get Some Hardwood
Front Gutter Is Installed
Front Porch Is Looking Good
Monster Deck Piers are Installed
Driveway is Re-Poured
Cabinets are Installed
Magical Reflection of Jade in Granite (Random)
Master Shower is Tiled
Hardwood is Installed Upstairs (unfinished for now...
►
2008
(30)
►
December
(11)
The First Tile (Guest Bath)
Drywall for Christmas
A Lot of Wires
A Lot of Plumbing
HVAC...Tucked Away
2nd Story Framing & Wiring
Crazy/Dangerous Ladder Scaffolding in the Foyer (T...
Finally, Stairs to the Basement (ie Easy Access to...
Our First Steps on the Deck
The Deck Begins
Dormer Is Framed
►
November
(8)
Danger Closet
The Tubs Are Delivered
The Dormer Is Opened
Front Bedroom is Framed
Front Porch is Decked and the Columns are Prepared...
Basement is Closed In
Work on the Second Floor Begins
Foundation Backfilled
►
October
(10)
Back Deck Footings Are Poured
Front Porch is Framed
Stairs to the Basement
New Front Foundation
The Wall Comes Down
Steel Beam and Center Beam Installed
Footings Poured and Front Porch Removed
The Man Cave, the Wall, and the Tree
Digging the Front Footings
No More Columns
►
September
(1)
Let the Games Begin